CPSC 220: Fall 2008 Lab Schedule

This table contains the tentative lab schedule.


Lab# / Date Topic Lab Worksheet
1. 9/4 (Th)  Binary Number System  Lab 1, Solutions
2. 9/11 (Th)  Two's Complement and Bit Vectors  Lab 2, Solutions
3. 9/18 (Th)  Bit Vectors and Floating Point  Lab 3, Solutions
4. 9/25 (Th)  Arithmetic Logic Unit (ALU)  Lab 4, Solutions
5. 10/2 (Th)  Arithmetic Logic Unit (ALU)  Lab 4 (continued), Solutions
6. 10/9 (Th)  Instruction Set Architecture (ISA)  Lab 5, Solutions
7. 10/16 (Th)  Instruction Set Architecture (ISA)  Lab 5 (continued), Solutions
8. 10/23 (Th)  Machine Language  Lab 6, Solutions
9. 10/30 (Th)  Machine Language  Lab 7, Solutions
10. 11/6 (Th)  Assembler  Lab 8, Solutions
11. 11/13 (Th)  Assembly Language  Lab 9, Solutions
12. 11/20 (Th)  I/O and Functions  Lab 10, Solutions
    11/27 (Th)  *** No lab -- Thanksgiving break ***
13. 12/4 (Th)  Stack  Lab 11, Solutions
14. 12/11 (Th)  N/A  No lab worksheet